CALL OR CLICK

BEFORE YOU DIG

Locate pipes + utility lines at no cost

Submit a request online

Correction

By: Ontario One Call

A change of non-critical information in the original request. These revisions do not affect the extent of work field and do not require Ontario One Call to redraw the excavation polygon. The request number on the correction remains the same as the original request and the original call time is retained (the sequence number will change in the audit report). “CORRECTION” is visible in the top right field of the ticket. There will be no charge for these notifications.